Post Tagged with: "Coastal Road"

Since its opening, 4.5 lakh vehicles have taken the Coastal Road

Since its opening, 4.5 lakh vehicles have taken the Coastal Road

The Coastal Road partially opened on March 12. Since then, it has seen over 450,000 vehicles in a nine-minute signal-free drive from Worli to Marine Drive, averaging about 19,500 vehicles per day. The highest traffic volume was recorded on March 15 with 22,880 vehicles, and the highest hourly traffic count was achieved on March 21 between 10-11 am with 2,943[Read More…]

by April 15, 2024 News
Coastal Road Tunnel Signboard Altered Amidst Controversy Over ‘Undersea’ Assertion

Coastal Road Tunnel Signboard Altered Amidst Controversy Over ‘Undersea’ Assertion

The Brihanmumbai Municipal Corporation (BMC) has made alterations to a signboard at the entrance of its tunnel on the coastal road near Nepean Sea Road. The previous sign claimed it as “India’s first undersea tunnel,” which raised questions from civic activist Zoru Bhathena, leading to a reassessment of the assertion. Now, the updated board describes it as the “largest diameter[Read More…]

by April 4, 2024 News
Mumbai coastal road inaugurated today : Offers seamless connectivity

Mumbai coastal road inaugurated today : Offers seamless connectivity

The Mumbai coastal road offers seamless connectivity, reducing travel time from 45-50 minutes to less than 10 minutes between Marine Drive and Bandra-Worli Sea Link The Mumbai Coastal Road Project (MCRP), officially named the Dharmveer Swarajya Rakshak Chhatrapati Sambhaji Maharaj Coastal Road, saw the inauguration of its first phase by Chief Minister Eknath Shinde, alongside Deputy Chief Ministers Devendra Fadnavis[Read More…]

by March 11, 2024 News
Coastal Road’s Load-Bearing Capacity Tested with 25-Ton Trucks

Coastal Road’s Load-Bearing Capacity Tested with 25-Ton Trucks

The Brihanmumbai Municipal Corporation (BMC) recently conducted load-testing on the soon-to-open southbound arm of the Coastal Road over the weekend. Heavy vehicles, each carrying up to 25 tons of material, were deployed to stand upon a section of the road spanning Haji Ali to evaluate its load-bearing capacity. This rigorous testing process aimed to ensure the structural integrity and durability[Read More…]

by February 20, 2024 News, Uncategorized